  • In this map it is given the actual hourly gas flow in the entrance and exit of a transmission system points - gas metering stations (GMS). 
  • Gas transmission service is provided after the operator receives a gas transportation order - nomination. Such orders must be submitted every day by system users who have purchased transmission system capacities and intend to use them - to transport gas through the Lithuanian transmission system, including gas transit to Kaliningrad. If nomination is sent for the smaller amount of gas, the transportation service is provided according to the quantities specified in the order.
  • The volume of the inlet of gas for transit to Kaliningrad at the Kotlovka GMS often differs from the outlet volume at the Šakiai GMS for technological reasons, balancing the flow and pressure parameters of two different systems. Although hourly gas volumes can fluctuate, physical daily and longer-term gas volumes are delivered to Kaliningrad as they arrive at the Kotlovka GMS for further transit.
  • Measurement units: 1,000,000,000 kWh = 1,000,000 MWh = 1,000 GWh = 1 TWh

  • In according with legel requirements, that were in force until 31 December 2014, historical data of capacities and gas flows are published in gas volume units at standart reference conditions: at measurement temperature of +20 °C and the pressure of 101.325 kPa.
  • Information about Nominations and Re-nominations submitted by Network Users is available on the ENTSOG Transparency Platform.
  • Maintenance works schedule.

Gas flow and capacity calculator

Please select parameters you need:

Actual information

Format



Clear

Data in relevant points of transmission system

Date

kWh/day

kWh/day

kWh/day

Capacity reserved for implicit capacity allocation kWh/day

kWh/day
Notes

Explanation

Other information

CONFIRMED PRELIMINARY Part of available capacity is reserved for Implicit Capacity Allocation via GET Baltic exchange. Capacity which was not allocated, will be allocated as available capacity after the trading session.

Data in relevant points of transmission system

Date

kWh/day

kWh/day

kWh/day

Capacity reserved for implicit capacity allocation kWh/day

kWh/day
Notes

Explanation

Other information

CONFIRMED PRELIMINARY Part of available capacity is reserved for Implicit Capacity Allocation via GET Baltic exchange. Capacity which was not allocated, will be allocated as available capacity after the trading session.

Domestic consumption data

Please select parameters you need:

Clear
Actual information
Format

Clear


Date Transmitted to directly connected consumers, kWh Transmitted to distribution systems, kWh Domestic consumption kWh
Total:
No data available